In the past two weeks Steve has framed in the kitchen. We also have the electrical lines in for our appliances and lighting. Next week the HVAC will be installed and the painter will be painting the trim on the exterior of the house. Steve took all the metal trim down and replaced it with wood. Steve's also been busy repointing the brick. We are trying to decide whether or not to paint the outside of the house.
4 months out..not sure when we will move in..